wfurrer wrote:
I am curious if anyone here does arc flash studies for a college campus? I work for large university and my group maintains over 200 individual studies of our campus buildings. We do all the field work, field 1-line drawings, SKM and labeling in-house. We review the studies and re-label on a 5 year cycle or as changes are made to the electrical systems. How do other college campuses handle arc flash studies?
I used to be the campus EE for a MAC conference school of about 19 000 students. Roughly about 60 large buildings and a bunch of houses and houses converted to offices etc.
The team consisted of me, when I had time. I did all the data collection, modeling and labeling. I got help from the Electric shop when it took 2 people to safely remove covers or access vaults and the like. For new buildings or major remodels I put it in the consultants scope to do the studies, stipulated the could not offload it to the contractor and required they turn over the SKM model to me when done.
There is a Big Ten school in my state that may or may not have alumni like me, Drew Brees and Neil Armstrong that has a full time team of folks dedicated to power studies and arc flash labeling. Or at least they did a few years ago when I last spoke to them about it.