1. Create Your User Profile and Status Updates

    Arc Flash Forum members are invited to create a user profile. Let others know who you are, what you do and even add a picture or avatar of yourself. What are you up to? Let people in the arc flash and electrical safety community know with "status updates"!
  2. Welcome to the All New Arc Flash Forum

    Arc Flash Forum is a community where we help each other learn about arc flash and electrical safety. There is still much to be learned about arc flash, standards, PPE, studies and more and We need your HELP!

    If you have good information about Arc Flash - Post It! If you have a question about Arc Flash - Post It! If you can provide answers to Arc Flash questions - Post it!

    Sign up as a today member! Feel free to link to this site www.arcflashforum.com. Tell your friends. We want to help everyone be safe in the workplace!
  3. Bigger and Better!

    As you have no doubt noticed, the forum has been through quite an upgraded and looks and feels very nice! There are loads of new features and ways in which this site can now be even more useful to the community in learning about Arc Flash and Electrical Safety.

    Create your detailed user profile
    Add a profile photo of yourself
    Like the forum on Facebook
    "Like" users' posts
    Publish your articles in the library
    ...and much, much more!

    Learn More About the New Features Here

120vac control wiring question

Discussion in 'Electrical Safety Practices' started by thompwil, May 21, 2009.

  1. thompwil New Member

    Howdy,
    Here's something that came up recently and the outcome should be simple, but, it is still being discussed and I was wondering what you all think. Sometimes it's difficult to understand what 70E is saying (no pun intended), but the truth is out there.......

    A maintenance person was working on a valve limit switch assembly with 120vac on the limit switches. The hot wire was loose and came out of the terminal strip. The maintenance person would not touch the wire to place it back into the terminal strip without the use of gloves. With gloves on it was impossible to accomplish this. So, the entire process was shut down, powered down, and the wire was replaced. Now for the question,,, is it permissable to touch the 120vac wire by holding it by the insulation to place it back into the terminal strip without gloves? Some say yes, some say no, based on the info in Table 130.2(c) and Table 130.7(c)(9)

    Any thoughts?

    Thanks,
    BT
  2. 60wag New Member

    Good question. Does "avoid contact" mean don't touch the wire conductor or don't touch the wire insulation?
  3. SPETE New Member

    Also if I may add...what if the person uses cushion grip needlenose? Some of these assemblies are tight even without gloves.
  4. TxEngr Member

    A very good question indeed. It raises two issues - working with gloves and working while energized. I can assume that he was troubleshooting when the wire came loose, else he would have needed an energized work permit. But once the wire came loose, was he still troubleshooting or was he performing energized work? If performing work, then 70E is pretty clear that the equipment should be de-energized if it is possible. Otherwise, he needs the energized work permit.

    As to the gloves, since 120VAC is avoid contact, I would think that holding the insulation or, even better, using voltage rated tools to hold the insulation would be satisfactory. I've done that in the past where the voltage gloves became a hinderance to troubleshooting. I'll be curious to hear other comments.

    TxEngr
  5. haze10 Well-Known Member

    I would agree with most of the above. Whether or not a Live Work Permit was needed depends upon whether or not you consider this to be routine work. In my shop we permit live work without permits if it is routine. There is training on what is and isn't routine, and its reviewed annually.

    The other option would have been gloves at 500V, that were on the tight side, and no leathers. This is permitted except you have to test or discard the gloves afterwards. Still cheaper than shutting down the line.

    I would also say, unless there was some very unusual circumstances, that you should pull this guy aside and talk with him a little. Any electrician who is leary of a task this simple, hasn't performed much real industrial work. I am NOT saying that in a cavalier manner. Most experience electricians know and are confident in working with 120V low amperage circuits hot. Electricians are the anti-matter counterpart of ballerinas, might have been a bad hair day.
  6. thompwil New Member

    Howdy,

    Thanks for the responses, I'm still not sure of the absolute interpretation of this. The Maintenance person involved is very competant, just didn't wish to get into any trouble by violating the sometimes foggy rules, and perhaps may have pressed the issue to get some resolution. I too have many times done work like this live without problems (before the safety program era). I'm somewhat relieved that I'm not the only one having these interpretation issues. Thanks for the responses.
    B.T.
  7. TxEngr Member

    Haze -I'm not familiar with an exemption for energized work for routine work - only for troubleshooting (infeasibility), greater hazard, and less than 50 volts. Can you point me in the direction of this exemption?

    Thompwill - sometimes it seems like the whole thing is up for interpretation, so you are not alone in your confusion - I'm right there with you.

    TxEngr
  8. haze10 Well-Known Member

    Look at the 2009 Handbook, 130.1(B) 1 where it talks about Routine work not needing a permit (or rather a long term permit).

    "...Permits that cover routine work tasks to be performed by trained and qualified employees can be written to cover a long period of time. For instance, a worker might be trained and qualified to replace a fuse that involves an exposed live part. If the worker is trained to understand the electrical hazards associated with exchanging the fuse and is wearing any necessary PPE, a permit might be issued that covers, for instance, a three month period..."

    Industry in the US today can not afford to hand hold trained and qualified electricians as they perform simply tasks well within their capability. The example of changing a fuse in a MCC lineup is a perfect case. Its 'infeasible' to shut down an entire manufacturing building to replace one fuse to get one pump running again. Its equally infeasible to call three managers out of the office to sign a Live Work permit. The 'written to cover a long period of time' terminology gives rise to the concept of a 'Standing Live Work Permit'. We use the Standing Live Work Permit in lieu of the Task Specific Live Work Permit for routine work. Routine work is defined in our corporate policy. We train our in-house electricians on what is and isn't considered routine. If it is routine, then they can perform the task (with proper PPE of course) under the Standing Work Permit and not require the task work permit. Since the code uses the term 'for instance, a three month period' as an example, we determined our policy for the Standing Permit to be 'One Year' at which time we retrain and review the policy. A word like 'for instance' is not a binding obligation but rather a suggestion. Our interpretation is that the suggestion was too short and we substituted one year. But it has to be coupled with training and supervision. In-house electricians are permitted to do certain tasks under the Standing Permit, but the same task by a contractor may require a Specific Live Task permit for that one job. In that case its not the Task, but rather the person performing the task that necessitates the permit.

    You have to remember that non of 130 is OSHA except for the General Duty clause. OSHA has said they won't fine you for an injury if you have an incident providing you are following 130. As long as you have a policy documented that conforms to 130, it would be hard for OSHA to say you were not 'compliant' with 130 because you substitute non binding examples. An example by its very definition is just that, an example of one of many possibilities, it is not the 'only' possibility.

    We do not have an actual document that is called a Standing Permit, its just written up in our policy as being that with details outlining the training requirement. In our case 12 months is the training cycle, but we are not in violation of our policy unless we exceed 15 months between training.

    Having written documentation, and then conforming to that documentation, will be the overriding judgement in defending your position. We may be pushing the envelope of the code in some areas, but only where the code doesn't make sense or treats trained professionals like incompetents.

    This is just our method, but it works and gives us the liberty to continue to manufacture in the USA.
  9. thompwil New Member

    Howdy,
    Thanks for all the information, A lot to think about. One thing for sure is, I need to order the 70E Handbook, trying to read the Standard and getting any understanding from it is difficult. Hopefully the Handbook will help.
    Thanks Again,
    B.T.
  10. TxEngr Member

    Haze,

    Thanks for the detailed description. I don't have a copy of the Handbook, only the Code book so I was not aware of the recommendation to use long term permits for routine work. Your method seems like a very workable method and we may look at something similar at our plant. Again, thanks for the amount of detail you included.

    It looks like I may need to order a Handbook as well.

    TxEngr