PDA

View Full Version : General Discussion


  1. 4 Foot Flash Protection Boundary??
  2. CB Setting Change
  3. Arc Sustainability
  4. DC Arc Flash Calculations
  5. Ground Fault Protection
  6. 3.9 Calories Cat 1 or 2?
  7. Low Voltage Single Phase Arc Flash
  8. Utility Arc Flash Studies
  9. Arc Flash Audit
  10. Arc Flash report - Example Wanted
  11. Breaker information
  12. Fault contribution from VFD or soft starter
  13. Secondary of the tranformer
  14. retrofit breaker
  15. Short Circuit vs. Fault Current
  16. Shock Hazard Analysis
  17. electrical arc calc
  18. "Need not be considered"
  19. Arc Flash Studies - How often?
  20. Fuse Manufacturers and TCCs
  21. Arc Flash Results
  22. First Arc Flash Study, Category #0 Questions
  23. Picking a AFB Minimum?
  24. Arc Flash Documentation
  25. Utility Contribution for AF studies
  26. Overdutied Breaker and Arc Flash
  27. Any cases to consider for Single Phase?
  28. PE stamps on AFH Studies
  29. Secondary Side of a XFMR Bank?
  30. Molded CB Exposed Face
  31. Multiple sources feeding a bus
  32. Arc Flash Labels for Bus Ducts
  33. 208V panel jumps from Cat 0 to Cat 4
  34. Causual effect on separate branch following an arc flash incident
  35. Maintenance Settings to Lower HRC and IE
  36. Mixing Tables and Calcs
  37. IEEE 1584 Arc Flash Calc for Ungrounded Systems
  38. Motor disconnects and welding disconnects
  39. AFB over 600 V and NFPA tables
  40. TCC Curve
  41. Open Air Switching over 15kV
  42. Taps on Transformers
  43. arc flash survey proposal
  44. ARC Flash rating for electric meter removal
  45. DC Arc Studies
  46. Motor Starter MCC
  47. Drive panels in arc flash hazard analysis.
  48. Arc Voltage accross 1mm Gap
  49. CT Locations for MV Switchgear
  50. The Table and Switchboards.
  51. Help me about IEEE1584
  52. How far down to go with the Study
  53. Remote Racking - Open Air
  54. Motor Contribution in Calculation
  55. No Switchgear LV MCCB only LV fusing
  56. Calculation of Incident energy at secondary of transformer
  57. Using NFPA 70E Annex F to reduce AF hazard
  58. 240/480V 1phase
  59. Determine PPE for Switchbards
  60. Confusion when to wear PPE
  61. Figuring Utility Contribution
  62. Coordination Studies - where is the Standard reference?
  63. Updating Utility Information
  64. Minimum current to sustain arcing current
  65. Can someone explain to me....?
  66. Panel Question
  67. Label w/Multiple IEs
  68. Recommendations for lowering incident energy
  69. Coordination Problem!
  70. GE 750 -ve seq
  71. Circuit Breaker operation-Dangerous
  72. 2 Second Maximum Clearing Time?
  73. Higher IE on CB Load Side
  74. Why do they say no labels?
  75. New to Arc Flash
  76. AFPB: Your take on 1.5 cal/cm^2 in some limited conditions
  77. Lawsuit Against Engineer
  78. Calculating Arc Flash Hazard at Unit Switchgear
  79. Mcc room?
  80. Reducing available short circuit current
  81. Panel vs. Panelboard
  82. Remote Racking
  83. Emergency generators
  84. who does the study?
  85. 130.3 Exception No. 1
  86. Need recommendations
  87. Does this make sense? If so, then how?
  88. Wind Turbine Transformers
  89. Single Phase, 230V
  90. Study Quality Control
  91. 480 & 208 CB Panel Inspections
  92. Category 0 vs Category 1
  93. Utility Data Clarification
  94. Standardized Working Distance
  95. MCC Bucket Line/Load Side
  96. Calculations for 208v System
  97. Retirement Home Analysis